skip to Main Content
One Of The Biggest Mistakes I See During Construction

One of the Biggest Mistakes I See During Construction

Thirty years as a consultant engineer has taught me that typical projects are broken into four major phases: feasibility, preliminary engineering, detailed design, construction and start-up. While the engineering phase is the most critical for your project’s development, the construction phase is the most complex. It’s when the rubber hits the road, when most of your budget is being spent, and when things could go wrong with even the best relationships sometimes ending in dispute and litigation. During the construction phase, there is a lot of complexity dealing with multiple contractors, subcontractors, vendors, equipment suppliers, government oversight, safety,…
Read more
WEBINAR: DHA Implementation – Creating Effective Solutions

WEBINAR: DHA Implementation – Creating Effective Solutions

About This Webinar This webinar has already taken place. To watch a recording, please see: https://youtu.be/H9nkQ1ECZFo Background In September 2015, NFPA issued NFPA 652 – Standard on the Fundamentals of Combustible Dust. This new standard integrates all of the older, industry specific standards, such as NFPA 61, 654 and 664, into a more consistent set of rules. The key new requirement is that non-food or grain facilities which handle or generate combustible dusts must complete a Dust Hazard Analysis (DHA) by September 2018. Food and grain facilities, under NFPA 61, have until September 2020 to complete their DHA’s. This…
Read more

Process System Design

The client planned to launch a new product from an existing feed stock and requested process design assistance from ADF Engineering. The new product would need to incorporate ingredient additions from several processes throughout the facility. The new product would…

Read more

Caustic Piping Redesign

The client approached ADF with a request to provide engineering services to redesign piping that would replace an aging system for a caustic treatment process. The intent of the project was to improve the pipe material specifications, provide better ergonomics…

Read more

Turn Head Replacement

The client approached ADF with a request to provide engineering services to replace a Turn Head in the grain receiving elevator. The new Turn Head would need to incorporate two new product receiving spouts while maintaining the existing spouting and…

Read more