skip to Main Content

Heavy Industrial Facility Air Cylinder Replacement

A Midwest heavy industrial facility was planning a multi-week outage and needed to fit this project into their timing. Included in the Scope of Work for client was the removal, refurbishment and re-installation of two process critical air cylinders, the…

Read More

Liquid Malt Extract Plant Expansion

This Ohio malt producer needed to expand their existing malt production facility to install a new vacuum belt spray dryer, new packaging equipment, new product receiving and blending equipment, new MCC room and new office and break areas. WORK COMPLETED:…

Read More

Pet Care Facility Mill Building Renovation

This Midwestern pet food manufacturer required assistance in renovating their facility that was built more than 30 years ago. The initial mill building portion of the facility was built in 1987 with an addition almost double the number of storage…

Read More

Steel Mill Boiler Design and Installation

The integrated steel mill uses Goggle valves to isolate downstream flow. These valves render an absolute tight shut off in blast furnace and basic oxygen furnace applications to assure the safety of personnel working downstream. The client wanted to exchange…

Read More

Iowa Ethanol Plant Expansion

The Iowa Ethanol Producer needed to repurpose existing buildings and structures, as well as add two new buildings, to be able to install a new DDG decanting, drying, and loading system. This project started in the conceptual phase and went through…

Read More

Process System Design

The client planned to launch a new product from an existing feed stock and requested process design assistance from ADF Engineering. The new product would need to incorporate ingredient additions from several processes throughout the facility. The new product would…

Read More

Caustic Piping Redesign

The client approached ADF with a request to provide engineering services to redesign piping that would replace an aging system for a caustic treatment process. The intent of the project was to improve the pipe material specifications, provide better ergonomics…

Read More

Turn Head Replacement

The client approached ADF with a request to provide engineering services to replace a Turn Head in the grain receiving elevator. The new Turn Head would need to incorporate two new product receiving spouts while maintaining the existing spouting and…

Read More

Module Skid Integration To Existing Process

The client approached ADF with a request to provide a 3D model of several existing process systems along with the facility infrastructure to allow for module skid integration into an existing process. The area to be modeled included recently added…

Read More