skip to Main Content

Stop by Booth 1441 at the Petfood Forum!

Stop By Booth 1441 At The Petfood Forum!

2019 Petfood Forum - Booth 1441 See ADF in booth 1441 at the Petfood Forum in Kansas City, April 29-30. Steve Minnich and Mario Ancona will be on hand to discuss ADF’s capabilities and expertise for the petfood and ingredient…

Read More

Visit booth 3329 at GEAPS in New Orleans!

Visit Booth 3329 At GEAPS In New Orleans!

2019 Grain Elevator and Processing Society Exchange Expo ADF is exhibiting at the GEAPS Exchange Expo at the Convention Center in New Orleans, March 9-12. Steve Minnich and Mario Ancona will be on hand to discuss ADF's capabilities and expertise…

Read More

One of the Biggest Mistakes I See During Construction

  Thirty years as a consultant engineer has taught me that typical projects are broken into four major phases: feasibility, preliminary engineering, detailed design, construction and start-up. While the engineering phase is the most critical for your project's development, the…

Read More

Secondary Containment Evaluation

A chemical company working with Lysine wanted to develop an overall facility site map drawing to show secondary containment volumes for each process area. The updated documentation will be referenced for future expansions and internal/external environmental audits. The secondary containment areas…

Read More

Pharmaceutical Manufacturer Facility Expansion

The client was operating at maximum capacity and contacted ADF Engineering to help expand their facility to provide additional capability. The finished product resulted in a high warehouse storage capacity and ancillary support facilities.   Project Summary   This project…

Read More

Boiler Design and Installation

Our client requested ADF’s services to design and implement a new 100,000 pound per hour natural gas-fired boiler into their existing steam and condensate process. The equipment was located in a new pre-engineered metal building at their lysine production facility,…

Read More

Waste Water Treatment Plant Installation

The client needed to replace their undersized waste water treatment (WWT) facility while maintaining plant production. The new WWT facility was designed to treat process water and rainwater at a combined rate of 500 gallons per minute, and then discharge…

Read More

Soy Product Loadout Facility

Our client wanted to replace their loadout system and move it to a new location within their international shipping facility. The new system needed to deliver a soy product into 40-foot sea containers at a rate of 100 tons per…

Read More